The following pictures show several views from the tower crane, moving
from west to east. Within a section, views proceed south to north.
Western Section: First Floor Deck Pour
|
Positioning the concrete pumper
|
|
Spreading concrete as is comes from the pumper
|
Western section: concrete is worked into place;
top part is complete, workers finish the lower central section, concrete is
pumped through the concrete pumper's pipe (white) in the lower right
|
|
Finishing work on the right; pumping on the left
Altogether, the floor is about 6" thick, supported on beams over 1' deep.
|
Central Section: progressing from south to north
|
Central section: the line of wooden 2x4's near the top third of the
picture shows the division between the first concrete pour (above) and the
central section (below).
|
|
North-central section: the dividing line with the western section is
barely visible at the top-left of the picture.
With the concrete being poured in the western area, the central section
becomes a storage area.
|
Eastern Section: progressing counterclockwise from south to north
|
South-eastern section: deck extends toward the existing Science building;
the court yard area is in the upper left
|
|
South-eastern section: decking now extends through much of the eastern
section, although some gaps still are present near the eastern wall on the
right.
|
North-eastern section: Decking for beams and floors is seen in the central
section (lower part of the picture); just base decking extends to the
eastern section (upper part of the picture).
|