The following pictures show several views from the tower crane, moving
from west to east. Within a section, views proceed south to north.
Western Section during Second Deck Pour
|
Western section: The first pieces of shoring are being installed near the
far wall. Much of the rest of this area serves as storage for
the second floor decking .
|
|
Western section: More storage of second-floor shoring.
|
Central Section near the Courtyard
|
South-central section: Courtyard area and southern-central section of decking.
|
|
South-central section: Another view of the courtyard area and adjacent decking.
|
Eastern Section
|
South-eastern section: The decking near the existing Math/CS/Psych building;
the chiller plant is at the top of the picture.
|
|
South-eastern section: a rebar mat is being installed on the decking along
the existing Math/CS/Psych building
|
East-central section: Looking north from near the existing Math/CS/Psych
building, the chiller plant is to the right — just beyond the edge of
the picture.
|
|
North-eastern section: Forms for the northern basement wall
|