Science Phase 2: Views from the Crane

15 February 2006

The following pictures show several views from the tower crane, moving counterclockwise from the west.

Click on any picture for the original, larger version.

western section
Western sections looking west: The first-floor concrete deck, with columns that will support the second floor.
central-south section
Central section and the future Science Library: With rebar in place for the beams and floors, electrical conduit extends from the location of breaker boxes to junction boxes.
south-eastern section
South Eastern Section: Decking is put in place in the eastern area, while rebar and electrical conduit are added in the central area. The wooden form (running down from the Science Building) will form the edge of the pour for the central area
east section
Eastern Section: Shoring for the second floor is being installed along the Chiller Plant. Decking is partially in place toward the south (right), and supports are placed toward the north (left)


created 17 February 2006
last revised 17 February 2006