These pictures were taken on 9 May 2006, in anticipation of the concrete
pour scheduled for Tuesday, 16 May 2006.
West Section
|
Looking westward at the roof forms and rebar, with the western corridor of
the existing building at the picture's top.
|
|
Close-up of the roof of the western section.
|
The Central Section
|
Looking southward toward the new courtyard and the existing Science
building.
|
|
When working on the framing and rebar for the eastern section of the roof,
the central section serves as a storage area for the rebar brackets (stored
in boxes) and other supplies.
|
East Section
|
Looking toward the east, with the chiller plant beyond
|
|
Looking southeast, the third-story roof extends to the north (bottom) and
east (left) of the greenhouse floor (center). The existing CS/Math/Psych
wing (top) appears beyond the greenhouse area.
|