Science Phase 2: Views from the Crane

9 May 2006

These pictures were taken on 9 May 2006, in anticipation of the concrete pour scheduled for Tuesday, 16 May 2006.

Click on any picture for the original, larger version.

West Section
western section (1)
Looking westward at the roof forms and rebar, with the western corridor of the existing building at the picture's top.
western section (2)
Close-up of the roof of the western section.
The Central Section
south-central section
Looking southward toward the new courtyard and the existing Science building.
central-northern section
When working on the framing and rebar for the eastern section of the roof, the central section serves as a storage area for the rebar brackets (stored in boxes) and other supplies.
East Section
eastern section (1)
Looking toward the east, with the chiller plant beyond
eastern section (2)
Looking southeast, the third-story roof extends to the north (bottom) and east (left) of the greenhouse floor (center). The existing CS/Math/Psych wing (top) appears beyond the greenhouse area.