This page provides access to materials related to the construction of Phase 2 of Grinnell College's Science Building.
These documents support the building process.
These spreadsheets indicate details of which folk, classrooms, and labs will move where and when.
These floor plans represent the current best guess regarding room assignments during this time of transition. Changes are likely, so these assignments should not be taken as authoritative.
Floor | Summer 2007 | Fall 2007 | January 2008 |
---|---|---|---|
Basement: | Draft: 12 January 2007 | Draft: 30 July 2007 | Draft: 16 January 2008 |
First Floor: | Draft: 15 January 2007 | Draft: 13 August 2007 | Draft: 28 Febeuary 2008 |
Second Floor: | Draft: 6 April 2007 | Draft: 23 Augut 2007 | Draft: 28 February 2008 |
Third Floor: | Draft: 30 July 2007 | Draft: 16 January 2008 |
The following links lead to pictures of the construction and campus.
January 2007 | |
---|---|
December 2006 | |
October 2006 | |
September 2006 | |
August 2006 | |
July 2006 | |
May 2006 | |
April 2006 | |
March 2006 | |
February 2006 | |
January 2006 | |
December 2005 | |
November 2005 | |
July 2005 |